Shenzhen Nordson Bo Communication Co., LTD

Home >  other information > 

On site installation matters for RF admittance level switches.microstrip filters for rf microwave applications

Time:2024-05-11 Views:1

  c23a1ca9fb9662b

  Radio frequency admittance level switches are widely used in industrial product industries such as petroleum, chemical, metallurgical, power engineering, biomedicine, food processing, papermaking, and decorative building materials. This device uses high-frequency technology to form a low-power RF signal from an electronic circuit on a temperature probe. The temperature probe serves as a sensitive component and will provide feedback to the electronic circuit on the signal transformation caused by the dielectric constant of the material level; Given that this transformation involves changes in capacity and conductivity, electronic circuits process a comprehensive transformation signal of capacitance and impedance; After proper handling, change the output of the relay. It improves the radio frequency admittance measurement technology based on the original capacitance measurement, which means a new level of level measurement today.

  On site assembly of RF admittance level switches:

  1. For on-site assembly design, but still try to assemble in places where vibration and corrosive air can cause mechanical damage. For the convenience of debugging, the dashboard should be assembled in a position with an operating platform or similar platform. The working environment temperature should be between -40~75 * C (140~75 * F). The dashboard assembly area requires wall lightning protection devices to prevent lightning.

  2. When assembling the dashboard, it is necessary to ensure that the central probe and shielding layer of the sensor do not touch the container wall (or assembly tube), have good insulation resistance, firmly connect the assembly thread to the container, make good electrical contact, and ensure that the ground end of the sensor enters the interior of the container. For places with large distances or mixing, sensors must be supported or anchored firmly, but the stable end must be insulated and resistant to the sensor.

  3. The instrument panel assembled according to explosion-proof requirements must be equipped with certified sealing packing boxes or explosion-proof steel pipe sealing connectors for each wiring connected to the explosion-proof casing. The instrument panel assembled according to this requirement must be equipped with certified safety gratings on each circuit.

  4. The ripple of 24VDC power supply shall not exceed 200MV. The ground wire of the switch power supply should be connected to a standard or standard instrument panel ground, not to the power ground. It is recommended to use shielded cables for on-site switch power cables, which can be used for parallel execution with AC power cables over long distances without shielding. The cable passing through the area requires a wall lightning protection device to prevent lightning.

  5. Before opening the explosion-proof housing of the instrument panel assembled according to explosion-proof requirements, it is necessary to ensure that the instrument panel has been powered off and has been powered off for more than 10 minutes.

hf splitter combiner

Read recommendations:

flat face hydraulic couplers

800M fiberglass omnidirectional antenna

baw rf filter

omni directional antenna ubiquiti.The advantages of radar level gauges

hf splitter combiner

Contact

0755-26701085 / 0755-26701002

Contact

sales@nxbtech.com

Contact Contact