Shenzhen Nordson Bo Communication Co., LTD

Home >  other information > 

ubiquiti omni directional access point.What should be noted during the installation of instrument level gauges?

Time:2024-05-24 Views:1

  00e99e4fb5d2d29

  The instrument must be installed vertically in order to operate normally. The float level gauge has been debugged according to the technical conditions provided by the user when it leaves the factory, and generally does not require user adjustment. Before installation, users can inspect it and try to use a medium that matches the density provided. Otherwise, the inspection can only be carried out through calculation. When installing the inner float, check whether the installation flange is in a horizontal position with the container, then install the gasket and install it correctly. If the media page fluctuates significantly, an anti wave tube needs to be installed to ensure accuracy.

  Before installing the external float level gauge, it is necessary to check the flatness of the upper and lower flanges of the container to ensure that the float level gauge is installed vertically. After vertical installation of the instrument, if the instrument display is not at zero point, zero point migration can be carried out according to the product operation instructions. After adjusting the zero point, firmly fix the indicator mechanism outside the measuring magnet by tightening the screws.

rf isolator ham radio

Read recommendations:

coax cable attenuator

isolator and circulator

programmable rf filter

coax locking terminator.Radio Frequency Filters in Microwave Communication

cubesat uhf transceiver.There are three reasons why the receiver may be good or bad at work

Contact

0755-26701085 / 0755-26701002

Contact

sales@nxbtech.com

Contact Contact