  1. Reasonably adjust the electricity load during peak hours

  Under normal circumstances, the load rate of the transformer should be controlled at around 60% as much as possible, so that the losses of the transformer are relatively low. Therefore, during peak electricity consumption periods, the equipment operation plan should be optimized, and some relatively unimportant mechanical and electrical loads and lighting loads should be removed to reduce peak load.

  2. Public lighting and office equipment operation management

  If it does not affect the office, the illumination should be lowered as much as possible or the lighting fixtures should be turned off in a timely manner. Unless there is a special need, decorative lighting fixtures should not be turned on for a long time. For areas with less personnel flow, lighting control switches should use induction, voice control, touch delay shutdown and other control methods. If conditions permit, real-time monitoring of the public lighting system can be carried out. Computers and other office equipment that have not been used for a long time should be powered off in a timely manner to reduce standby losses.

  3. Air conditioning system operation management

  Lowering the set temperature of air conditioning by 1 ℃ in summer will increase energy consumption by 9%; Raising the temperature by 1 ℃ in winter will increase energy consumption by 12%. Therefore, adjusting the temperature setting of the air conditioner appropriately is an effective measure for energy conservation in air conditioning. At the same time, using equipment monitoring systems to strengthen the operation and management of air conditioning system equipment, and adjusting the air conditioning system operation plan in a timely manner according to changes in system load and meteorological environment, reducing the total power of equipment operation, and controlling the optimal start stop time of air conditioning equipment can shorten unnecessary operation time of air conditioning while ensuring comfortable environment, in order to achieve energy-saving operation.

  4. Elevator operation management

  During low peak operation, it is necessary to adjust the program to shut down some elevators in a timely manner and minimize the empty or low load operation of elevators as much as possible. During peak operation, measures can be taken to reduce the number of floors or staggered stops for each elevator according to the plan, extend the elevator travel, shorten the operating cycle, and significantly improve the operating speed, thereby improving its operational efficiency.

omnidirectional mimo antenna

Read recommendations:

wideband rf circulator

UHF broadband transceiver system

Coaxial isolator

3 way rf combiner.Coaxial Termination Usage

omnidirectional mimo antenna.Introduction to 3dB Bridge

Contact

0755-26701085 / 0755-26701002

Contact

sales@nxbtech.com

Contact Contact